Skip to main content

This is a new service – your feedback will help us to improve it.

Flooding is expected - act now

Flood warning for Groundwater flooding in the Bourne Valley - The Collingbournes

Get flood warnings by phone, text or email

High groundwater levels are expected to cause flooding. 

Flooding is expected in response to recent rainfall. 

Areas that could be affected include: Aughton, Collingbourne Kingston and Collingbourne Ducis. The groundwater level at the Everleigh borehole has risen to 135.10m, and is expected to rise into next week. Residents are advised to prepare property resilience measures and ensure that pumps are working where they have been installed. Residents may experience inundation of septic tanks and sewer systems. Flooding of roads is expected, take particular care when driving, both for your own safety and to prevent flooding to others. Intense rainfall will lead to surface water flooding. 

We are closely monitoring the situation . 

If you have a pump, make sure it is working and switched on. Think about alternative power sources in case of power cuts . 

This message will be updated by 3:45PM on 17 February 2026 or as the situation changes.

Flood warning area: Groundwater flooding for the Collingbournes.

Give feedback on this flood warning information

Latest level

47 minutes ago

The Groundwater level at Hazelberry Plantation was 126.10 metres. Property flooding is possible when it goes above 127.50 metres.

Monitor the latest level at Hazelberry Plantation

This level will update automatically

Find a river, sea, groundwater or rainfall level in this area